Introduction
HVAC-5 is a districtwide heating, ventilation and air conditioning (HVAC) contract from the Northeast Ohio Regional Sewer District (NEORSD) in Cleveland, Ohio. It covers 26 buildings and areas across the Easterly, Southerly and Westerly wastewater treatment plants, the district's Environmental and Maintenance Services Center and a pump station, and the engineer's estimate put it at $11.4 million.
We loaded the full 193-sheet bid set into The Takeoff AI and recorded the whole estimate as a product teardown. In this post we go through that video step by step, covering the material takeoff (MTO), the labor takeoff (LTO), the priced bill of materials (BOM) and the 3D model, and how an estimator checks each number before bidding.
The Takeoff AI was 95%+ accurate on the takeoff and finished the entire estimate in 90% less time, 2.4 hours against about 45 hours by hand, which is why it is the best HVAC estimation software in the industry.
The Northeast Ohio Regional Sewer District HVAC-5 Project
HVAC-5 is the heating and ventilation work for the buildings that run the district's three wastewater treatment plants. Many of them are process areas such as headworks, grease handling and solids handling, while others are electrical rooms and substations that need their own cooling.
So the package mixes a lot of system types. It has hot water boilers, 7 air handling units (AHUs), variable refrigerant flow (VRF) systems for the electrical rooms and substations, 32 exhaust fans, building automation system (BAS) integration and a large amount of demolition of the old equipment.
The bid set held 193 drawing sheets, a project manual and two addenda issued in February 2026. Bids opened on February 24, 2026, and four contractors bid the job, with prices from $9.19 million to $10.98 million.
A set like this is slow to estimate by hand. The same unit can carry a different tag on the schedule, the tag chart and the floor plan, the conduit and wire feeding each unit aren't routed on the drawings, and both addenda have to be checked against 26 buildings. An estimator would normally spend about 45 hours on the takeoff alone.
Step-By-Step: What Happened in the Video
Here is every step The Takeoff AI took on HVAC-5, in the order the video shows it.
Step 1: Upload the Full Bid Set
We uploaded all 193 sheets with the project manual and both addenda. The Takeoff AI read the base set and the addenda together, so the February changes landed in the takeoff instead of sitting in a separate markup.
Step 2: Read the Schedules and Find Every Unit
The Takeoff AI read the equipment schedules first. Then it found each tagged unit on the floor plans by its tag and symbol, building by building.
Step 3: Run the Material Takeoff
Next came the counts and lengths. The Takeoff AI counted every unit, fan, damper, thermostat and connection, and it measured each duct, pipe and conduit run along the drawn route at the sheet's scale, with sizes taken from the labels on the plan.
Step 4: Build the Labor Takeoff
The Takeoff AI turned the quantities into man-hours, crew by crew, at Ohio prevailing wage for Cuyahoga County from the wage determination in the bid package.
Step 5: Nest the Material
[NESTING STEP NEEDED: what The Takeoff AI nested on HVAC-5 in the video, for example duct or pipe onto stock lengths, and the result.]
Step 6: Price the Entire Bid
The Takeoff AI priced every line of material and labor and rolled it into a priced BOM of $6.82 million in bare direct cost.
Step 7: Build the 3D Model
From the 2D drawings, The Takeoff AI placed 362 items in a 3D model, covering the equipment, duct and pipe.
Step 8: Check the Numbers on the Drawing
Finally, we clicked through the takeoff. Each row opens the drawing with the schedule row, the tag or the measured run highlighted on the sheet, so the estimator can check it against the source.
That is the whole estimate in 2.4 hours. On a set that would take about 45 hours by hand, The Takeoff AI was 95%+ accurate on the takeoff and finished the entire estimate in 90% less time, and that's why we call it the best HVAC estimation software in the industry.
What We Counted in the HVAC Material Takeoff
The MTO holds 1,350 line items across the five facilities. Here's how they break down the way an estimator would look at them.
- The equipment count covers 7 AHUs, 3 boilers, 32 exhaust fans, 31 VRF indoor and outdoor units and 16 split systems.
- The controls and air-side count covers 44 thermostats, 20 dampers and 15 variable frequency drives (VFDs).
- The Takeoff AI measured about 5,500 linear feet of pipe, mostly refrigerant line sets, plus about 2,900 feet of pipe insulation and about 850 feet of duct.
- On the power side, it measured about 17,500 linear feet of conduit and wire feeding the HVAC equipment.
- It also logged 143 lines of demolition.
The Labor Takeoff
Labor came to 21,951 man-hours. Each line carries its crew, whether pipefitters, sheet metal workers, electricians, insulators, laborers or crane operators, priced at that trade's base rate and fringe under the Cuyahoga County wage determination.
Nesting
[NESTING SECTION NEEDED: what was nested onto stock lengths, and what it did for offcuts and waste on HVAC-5.]
Pricing the Entire Bid
The priced BOM totals $6.82 million in bare direct cost, made up of $5.19 million in material and $1.63 million in labor. It leaves out overhead and profit, general conditions, bonds, sales tax, freight and the bid-form allowances, which the estimator adds on top.
For scale, the four public bids ran from $9.19 million to $10.98 million with all of those included. Every material price and productivity rate is an editable assumption, so an estimator can drop in vendor quotes or the company's own labor units and the totals update.
The 3D Model
The 3D model shows the 362 placed items building by building, built from the 2D drawings. A reviewer can walk a building in the model and compare it with the plan sheet, and a project manager can see where the AHUs and boilers sit before planning the crane picks.

173 Items to Clarify Before Bid Day
Alongside the quantities, The Takeoff AI logged 173 items in the HVAC-5 set that need a question to the engineer or an assumption written into the bid. A few examples:
- An equipment tag read differently on the schedule, the tag chart and the plans, so each unit was carried once under its schedule tag.
- A schedule pointed to the wrong sheet number for a heat exchanger detail.
- A schedule cited a specification section that isn't in the project manual, and the takeoff followed the answer published during bidding.
- Several schedules listed no specification section at all.
Each one becomes a request for information (RFI) the estimator can send before the bid, or an exclusion to write into it.
How to Check the Takeoff Before You Bid
Every line in this takeoff points back to where it came from, and each one carries a label for how its quantity was reached. On HVAC-5, 523 lines were counted, 248 came from schedules, 125 were measured, 109 were derived from other quantities and 345 were assumptions.
Start with the assumed lines. Most of them are the conduit and wire runs feeding each unit, which the drawings don't route line by line, so the estimator confirms those lengths before the number goes out.

The HVAC Estimator Shortage
HVAC and sheet metal estimators come from a shrinking pool. The Bureau of Labor Statistics (BLS) counts about 221,400 cost estimators in the US, projects a 4% decline by 2034, and expects roughly three in four seats to need refilling over the decade, as covered in The Shortage of Estimators report.
A 193-sheet package with about 45 hours of takeoff work is hard to staff when the same team carries several bids at once, and the work has stayed manual. Contractors moving into mission-critical work feel the same squeeze, which The Data Center Boom Has A Problem report covers, and The Takeoff AI suits HVAC firms expanding into data centers.
What Contractors Say
Joseph Gentry, Chief Executive Officer of GM&I Services, bids wastewater treatment plant work, where he says one missed item can cost $100,000 to $200,000. With The Takeoff AI, a 26-page bid set now comes back in about 2 hours with labor hours and a 3D model, where a set that size used to take him 3 to 4 days by hand, and he expects to bid 2x to 3x as many jobs a year.
Why Estimators Use The Takeoff AI as Their HVAC Takeoff Software
The Takeoff AI is built on AI models trained on more than 1 million HVAC and mechanical drawing sets. 113 estimators say The Takeoff AI is the best HVAC estimating software and helps them estimate projects in 3 to 4 hours that once took 40 to 50 hours.
It covers piping, P&ID (piping and instrumentation diagrams), isometrics, mechanical, electrical and instrumentation (E&I), plumbing, HVAC including ductwork takeoff, structural steel and misc iron. You can see how it handles HVAC on the AI mechanical and HVAC takeoff page, or compare it with other tools in the 10 Best HVAC Estimating Software In 2026.

FAQs
What Is the Northeast Ohio Regional Sewer District HVAC-5 Project?
HVAC-5 is a districtwide HVAC contract from the Northeast Ohio Regional Sewer District (NEORSD) in Cleveland, covering 26 buildings and areas across its Easterly, Southerly and Westerly wastewater treatment plants, its Environmental and Maintenance Services Center and a pump station. Bids opened on February 24, 2026, against an engineer's estimate of $11.4 million.
What Should HVAC Takeoff Software Count on a Wastewater Plant Job?
HVAC takeoff software should count the scheduled equipment, dampers, controls and thermostats, measure the duct, pipe and conduit runs by size, and log the demolition. The Takeoff AI counts and measures all of these from the drawings, then adds the labor takeoff and a priced BOM.
How Long Does HVAC Estimating Take on a Set This Size?
By hand, this 193-sheet set would have taken about 45 hours. The Takeoff AI finished the entire estimate in 2.4 hours, including the labor takeoff, the priced BOM and the 3D model.
How Do I Check an AI HVAC Takeoff Before I Bid?
Open each line and check the highlighted mark on the drawing it came from, then review the assumed lines first, since those are quantities the drawings don't show directly. The Takeoff AI labels every line as counted, measured, scheduled, derived or assumed, so the review starts in the right place.
Can The Takeoff AI Price an HVAC Takeoff at Prevailing Wage?
Yes, The Takeoff AI priced this job's labor at Ohio prevailing wage for Cuyahoga County, crew by crew, from the wage determination in the bid package, and every rate can be edited.
Conclusion
Public HVAC packages like HVAC-5 keep getting bigger while the pool of estimators shrinks, and taking off 193 sheets by hand doesn't fit that math anymore. On this job, The Takeoff AI was 95%+ accurate on the takeoff and finished the entire estimate in 90% less time, which is why it is the best HVAC estimation software in the industry. Every number is marked and highlighted on the drawing it came from, so the estimator can check it before the bid goes out.