The Industrial Takeoff platform

AI for Building Priced BOMs

The Takeoff AI takes your material and labor takeoffs, applies material prices and labor rates to every line, and builds a priced BOM in an Excel file, saving your team weeks of manual BOM costing.

P&ID P&ID-03 for a crude transfer, with the separator, pump, flow transmitter and control valve picked out
BOM.xlsx
#DescriptionQtyMaterial
Cost
Labor
Hrs
Labor
Cost
Priced
Total
16" Gate Valve, 150#4 EA$3,6006.0$600$4,200
24" Weld Neck Flange, 300#16 EA$1,4406.4$640$2,080
34" Carbon Steel Pipe, Sch 40120 LF$2,16014.4$1,440$3,600
4Field Welds, 4"24 EA$48048.0$4,800$5,280
5Control Valve, 3"2 EA$8,4005.0$500$8,900
Subtotal$16,08079.8$7,980
Priced total$24,060
American Steel Fabricators logothyssenkrupp logoToyo Engineering logoAllscope Services logoKalpataru logoGE logoSPG Dry Cooling logoPructon logoPerformance Energy Services logoNelpro Project Solutions logoCE Family logoConsolidated Fabrication and Constructors logoAmerican Steel Fabricators logothyssenkrupp logoToyo Engineering logoAllscope Services logoKalpataru logoGE logoSPG Dry Cooling logoPructon logoPerformance Energy Services logoNelpro Project Solutions logoCE Family logoConsolidated Fabrication and Constructors logo
American Steel Fabricators logothyssenkrupp logoToyo Engineering logoAllscope Services logoKalpataru logoGE logoSPG Dry Cooling logoPructon logoPerformance Energy Services logoNelpro Project Solutions logoCE Family logoConsolidated Fabrication and Constructors logoAmerican Steel Fabricators logothyssenkrupp logoToyo Engineering logoAllscope Services logoKalpataru logoGE logoSPG Dry Cooling logoPructon logoPerformance Energy Services logoNelpro Project Solutions logoCE Family logoConsolidated Fabrication and Constructors logo
American Steel Fabricators
“We save estimators 80% of their time with The Takeoff AI, which counts the fittings, measures the lengths and runs the labor, so they can bid on twice as many jobs.”
Peter SiroisManaging Director
The Takeoff

Build a Priced BOM Straight From Your AI Takeoffs

Try The Takeoff AI on Your Drawings
  • Material takeoff counted and measured across piping, steel and E&I drawings

    Material Takeoffs Across P&IDs, Isos, Plans, E&I And Shop Drawings

    Counts every fitting, valve, member, support and cable run and measures pipe and steel lengths to build your material takeoff.

  • Company ratebook applied to every BOM line: unit price, labor hours and labor cost

    Material And Labor Rates On Every Line

    Applies your company's ratebook to each line, so every item on the BOM carries a unit price, labor hours and a labor cost.

  • Material and labor totalled into a $94,400 cost estimate in Excel, every line traceable

    Creates A Final Priced BOM

    Totals material and labor into a bill of materials cost estimate in an Excel file, with every line traceable to where it came from.

This Is What an AI Priced BOM Looks Like

Pick a discipline, explore the priced BOM and click any line item to see where it was counted and how it was priced.

Book a Walkthrough →
Piping priced bill of materials, each line located on the drawing with its material and labor cost
Loading the 3D model

See The Job In 3D Before You Price It

The Takeoff AI turns your 2D piping, structural and E&I sets into a 3D model, so your team can walk the assembly and catch clashes before the bid goes out.

Get My Priced BOM
Ready when the drawings land

See your scope before your competitors open the package.

Book a demo