How to Do a Concrete Takeoff

How to Do a Concrete Takeoff

A concrete takeoff lists the volume, formwork, rebar and embeds on a job. Follow these steps for a concrete quantity takeoff you can price and check.

P
By Pranjal BhartiNovember 20, 2026
6 min read

Introduction

A concrete takeoff is the list of everything a concrete scope needs, measured from the drawings. It covers the concrete volume for each footing, slab, wall and column, the formwork area, the rebar by size and length, and the embeds and anchor bolts cast into the pours.

Estimators normally do this by hand. They scale each element off the structural and civil sheets, enter the length, width and depth into a spreadsheet, and repeat the exercise for forms and for rebar. A foundation package with pile caps, grade beams and equipment pads can take days.

That pace no longer fits how concrete work is bid, since there are fewer estimators, more invitations and bigger drawing sets. An error in depth or a missed pad goes straight into the price.

This guide walks through how to do a concrete takeoff step by step, with the formulas and the checks to run before pricing. Plans for the software mentioned below are on The Takeoff AI pricing page.

The Takeoff AI saves estimators 90 to 95% of their estimating time.

concrete-foundation-construction-crew

What a Concrete Quantity Takeoff Includes

A concrete quantity takeoff includes four groups of quantities.

  • Concrete volume is measured in cubic yards for each element.
  • Formwork is measured in square feet of contact area, which is the surface of concrete touching a form.
  • Rebar is listed by bar size and total length, then converted to weight.
  • Embeds, anchor bolts, joints and vapor barrier are counted or measured as separate lines.

Steps for a Concrete Takeoff

  1. Gather the structural drawings, the civil drawings, the specifications and every addendum, and note the concrete strength and rebar grade for each element.
  2. List every element type on the job, such as spread footings, grade beams, slabs on grade, walls, columns and pads.
  3. Measure each element and calculate its volume by multiplying length, width and depth in feet and dividing by 27 to get cubic yards.
  4. Calculate formwork contact area from the sides of each element, leaving out faces cast against earth.
  5. Take off rebar from the plans, schedules and typical details, including laps, hooks and dowels.
  6. Count embeds and anchor bolts by mark from the schedules.
  7. Add a waste allowance to concrete and rebar based on your own job history.

concrete-quantity-takeoff-site

A Worked Example

A slab on grade that is 60 feet long, 40 feet wide and 6 inches thick holds 1,200 cubic feet of concrete, which is 44.4 cubic yards. A continuous footing that is 120 feet long, 3 feet wide and 1.5 feet deep holds 540 cubic feet, which is 20 cubic yards.

Rebar converts from length to weight with standard unit weights. A #4 bar weighs 0.668 pounds per foot and a #5 bar weighs 1.043 pounds per foot, so 2,000 feet of #5 bar weighs about 2,086 pounds before laps and waste.

Checks to Run Before Pricing

Three checks catch most concrete takeoff errors. Compare slab thickness on the plans against the sections, because the two often disagree after an addendum. Confirm that every equipment pad on the mechanical drawings also appears in your count. Review the general notes for rebar lap lengths, since a longer lap changes the tonnage on every bar.

How The Takeoff AI Does a Concrete Takeoff

The Takeoff AI is the best option for contractors who need a concrete takeoff done and priced in hours. It estimates from your structural and civil drawings, counts embeds and anchor bolts, and measures concrete volume by element (footings, slabs, walls and columns), formwork area and rebar by size and length.

It is built on AI models trained on more than 1 million concrete and structural drawing sets. It delivers 95% accuracy, and every number is marked and highlighted on the drawing it came from, so someone can check each quantity before the bid goes out. Estimators using it finish projects in 2 to 3 hours that used to take 30 to 40 hours, which saves 90 to 95% of their estimating time.

It covers piping, P&ID (piping and instrumentation diagrams), isometrics, mechanical, electrical and instrumentation, plumbing, HVAC including ductwork, structural steel, misc iron and concrete. The output is a material takeoff (MTO), a labor takeoff and a priced bill of materials (BOM), along with a 3D model built from the 2D drawings.

Joseph Gentry, Chief Executive Officer of GM&I Services, took a 26-page set from 3 to 4 days by hand to about 2 hours, with labor hours and a 3D model included. See the concrete estimating page, or request a demo of The Takeoff AI.

rebar-takeoff-foundation-crew

The Estimator Shortage in Concrete Estimating

Concrete estimating has stayed a hand-measured job while the people who do it are leaving. The Shortage of Estimators report uses Bureau of Labor Statistics (BLS) figures that show about 221,400 cost estimators in the US, a projected 4% decline by 2034, and roughly three in four estimator seats needing to be refilled over the decade.

A concrete contractor with one or two estimators cannot scale every footing by hand and still bid more jobs. The measuring has to move to software.

estimating-concrete-quantities-site

FAQs

What is a Concrete Takeoff?

A concrete takeoff is a measured list of the concrete volume, formwork, rebar and embeds on a project. Estimators use it to price materials and labor for a bid.

How Do You Calculate Concrete Volume in Cubic Yards?

Multiply length, width and depth in feet to get cubic feet, then divide by 27. A slab 60 feet by 40 feet by 6 inches thick is 44.4 cubic yards.

How Much Waste Should a Concrete Takeoff Include?

The allowance depends on the element and the placing method, so use the figures from your own completed jobs. Apply it as a separate line so the net quantity stays visible.

How Does The Takeoff AI Do a Concrete Quantity Takeoff?

The Takeoff AI estimates from the drawings, measures volume, formwork and rebar, and counts embeds and anchor bolts. Each quantity is highlighted on the sheet it came from so you can check it.

How Much Time Does AI Save on a Concrete Takeoff?

Estimators using The Takeoff AI finish projects in 2 to 3 hours that used to take 30 to 40 hours. That is 90 to 95% of estimating time saved.

concrete-pour-construction-crew

Conclusion

Concrete takeoffs are still measured by hand, and the estimators who measure them are getting harder to hire. The Takeoff AI is the best option for contractors who need the concrete takeoff done and priced in hours. For related reading, see the Handbook entry on rebar takeoff, or request a demo of The Takeoff AI.