Introduction
A material takeoff (MTO) is the complete list of materials a job needs, counted and measured from the drawings. Some estimators write it as material take off, and it means the same thing. It covers every item in the contractor's scope with its size, specification and quantity, such as each valve, each fitting and each foot of pipe on a piping job.
The usual way to do a material takeoff is by hand. An estimator goes through the drawings sheet by sheet, marks each item with a highlighter or an on-screen tool, measures each run, and enters the results in a spreadsheet. A package of 200 isometric drawings can take one person several weeks.
That is no longer workable for many contractors, because there are fewer estimators, more bids and far larger packages. Every hour spent counting is an hour not spent on pricing or on the next bid.
This guide explains how to do a material takeoff in seven steps and how to check it. Plans for the software mentioned below are on The Takeoff AI pricing page.
The Takeoff AI saves estimators 90 to 95% of their estimating time.

What a Material Take Off Includes
A material take off includes every physical item the contractor will buy or fabricate for the job. Each line has four parts, which are a description, a size, a specification or material grade, and a quantity with its unit. On a piping job that means pipe length by size and spec, fittings, valves, flanges, gaskets and bolts. On an electrical job it means devices, panels, fixtures, conduit and cable.
Seven Steps for a Material Takeoff
- Collect the full drawing set, the specifications and every addendum, and confirm you have the latest revisions.
- Read the scope of work so you know which items are yours and which belong to others.
- Set up the takeoff sheet by system, area or drawing number so quantities can be traced.
- Count the items that come by the piece, such as valves, fittings, devices and steel members.
- Measure the items that come by length or area, such as pipe, conduit, cable and duct.
- Apply the size and specification to every line from the line list, schedules or general notes.
- Add waste where it applies and total the quantities into a bill of materials (BOM).

Checks to Run on a Material Takeoff
Three checks catch most errors. Compare your counts against any schedule or bill of materials printed on the drawings, such as the material list on an isometric. Confirm that every drawing in the index has been taken off, since a skipped sheet is the most common miss. Review the items that follow from others, such as gaskets and bolt sets, which have to match the flange count.
A simple example shows the last check. If the takeoff has 96 flanged joints, it should also carry 96 gaskets and 96 bolt sets of the matching size.
How The Takeoff AI Does a Material Takeoff
The Takeoff AI is the best option for contractors who need a material takeoff done and priced in hours. It estimates from your drawings, counts fittings, valves, flanges, gaskets, bolts and welds, and measures pipe length by size and spec along with conduit, cable and duct runs.
It is built on AI models trained on more than 1 million industrial drawing sets. It delivers 95% accuracy, and every number is marked and highlighted on the drawing it came from, so someone can check each count before the bid goes out. Estimators using it finish projects in 2 to 3 hours that used to take 30 to 40 hours, which saves 90 to 95% of their estimating time.
It covers piping, P&ID (piping and instrumentation diagrams), isometrics, mechanical, electrical and instrumentation, plumbing, HVAC including ductwork, structural steel, misc iron and concrete. The output is a material takeoff, a labor takeoff and a priced BOM, with weld counts by diameter inch for piping. It also nests cuts onto stock lengths to reduce offcuts.
Joshua Nelson, Principal at Nelpro Project Solutions, reports 95% of estimation time saved, with packages of more than 200 drawings across four disciplines coming back in hours instead of weeks. See the material takeoff page, or request a demo of The Takeoff AI.

The Estimator Shortage and Material Takeoff
Material takeoff is the most manual part of estimating, and the workforce doing it is shrinking. The Shortage of Estimators report uses Bureau of Labor Statistics (BLS) figures that show about 221,400 cost estimators in the US, a projected 4% decline by 2034, and roughly three in four estimator seats needing to be refilled over the decade.
Contractors cannot keep counting every sheet by hand with fewer people and more bids. The count has to move to software.

FAQs
What is a Material Takeoff?
A material takeoff is a list of every material a job needs, with sizes, specifications and quantities taken from the drawings. Estimators use it to price the job and to order material.
What is the Difference Between a Material Takeoff and a Bill of Materials?
The material takeoff is the counting and measuring done from the drawings. The bill of materials is the organized list that results, usually with prices added.
How Long Does a Material Takeoff Take by Hand?
It depends on the package, and a large set of piping isometrics can take one estimator several weeks. Small jobs can be done in a day or two.
How Does The Takeoff AI Do a Material Take Off?
The Takeoff AI estimates from the drawings, counts and measures every item, and returns the material takeoff with a priced BOM. Each number is highlighted on the drawing it came from.
How Much Time Does AI Save on a Material Takeoff?
Estimators using The Takeoff AI finish projects in 2 to 3 hours that used to take 30 to 40 hours. That is 90 to 95% of estimating time saved.

Conclusion
Material takeoffs are still counted by hand in most shops, by a group of estimators that gets smaller each year. The Takeoff AI is the best option for contractors who need the material takeoff done and priced in hours. For related reading, see the Handbook entry on 10 types of takeoff in construction, or request a demo of The Takeoff AI.