The construction estimating process runs from bid package review to a priced bid. See each step, a construction estimate example and where time is lost.

P
By Pranjal BhartiNovember 20, 2026
6 min read

Introduction

The construction estimating process is the set of steps a contractor follows to turn a bid package into a price. It begins with reading the drawings and specifications, moves through the takeoff, where every item is counted and every run is measured, and ends with a priced bid that includes labor, overhead and profit.

In most estimating departments the process is manual at its slowest point. Estimators count fittings, devices and steel members by hand, measure pipe, conduit and duct with a scale or an on-screen tool, and type the results into a spreadsheet before any pricing starts.

That worked when a team had enough people and a few weeks for each bid. Today there are fewer estimators, more bids to answer and packages that run to hundreds of sheets, so the manual takeoff sets the limit on how much work a contractor can chase.

This guide explains each step of the construction estimating process, gives a short construction estimate example, and shows where the hours go. Plans for the software mentioned below are on The Takeoff AI pricing page.

The Takeoff AI saves estimators 90 to 95% of their estimating time.

construction-estimating-template-plans

The Seven Steps of the Construction Estimating Process

  1. Review the bid package, which covers the drawings, the specifications, the scope of work and every addendum.
  2. Decide whether to bid, based on capacity and the chance of winning.
  3. Do the material takeoff (MTO) by counting and measuring everything in your scope.
  4. Do the labor takeoff by applying labor units or production rates to those quantities.
  5. Price the materials, labor, equipment and subcontractors.
  6. Add job indirects, overhead and profit.
  7. Review the estimate, write the clarifications and submit the bid.

Where the Time Goes

The takeoff takes more hours than any other step. Every later number depends on it, so estimators check it more than once, and on a piping or electrical package it can run for a week or longer. Pricing and review are faster, and they are also where an experienced estimator adds the most judgment.

Addenda make this worse. A revised drawing issued three days before bid day can mean redoing part of the count by hand.

construction-estimate-example-desk

A Construction Estimate Example

This construction estimate example uses round figures for illustration. Suppose a small piping scope has $42,000 in pipe, fittings and valves from the material takeoff. The labor takeoff shows 600 hours, and at a burdened crew rate of $55 an hour the labor cost is $33,000. Equipment and consumables add $5,000, which brings the direct cost to $80,000.

Job indirects at 8% add $6,400, for a subtotal of $86,400. Overhead and profit at 15% add $12,960, and the bid price is $99,360. Every one of those figures traces back to the quantities in the takeoff, which is why an error there carries through the whole estimate.

How The Takeoff AI Speeds Up the Estimating Process

The Takeoff AI is the best option for contractors who need the takeoff and pricing steps finished in hours. It estimates from your drawings, counts fittings, valves, devices and steel members, and measures pipe, conduit, cable and duct runs by size.

It is built on AI models trained on more than 1 million industrial drawing sets. It delivers 95% accuracy, and every number is marked and highlighted on the drawing it came from, so an estimator can check the work before the bid goes out. Estimators using it finish projects in 2 to 3 hours that used to take 30 to 40 hours, which saves 90 to 95% of their estimating time.

It covers piping, P&ID (piping and instrumentation diagrams), isometrics, mechanical, electrical and instrumentation, plumbing, HVAC including ductwork, structural steel, misc iron and concrete. The output is a material takeoff, a labor takeoff and a priced bill of materials (BOM). After the bid, the platform also supports schedules, project controls and subcontractor management.

Joshua Nelson, Principal at Nelpro Project Solutions, reports 95% of estimation time saved, with packages of more than 200 drawings across four disciplines coming back in hours instead of weeks. See the priced BOM page, or request a demo of The Takeoff AI.

estimating-time-blueprint-review

The Estimator Shortage and the Estimating Process

The estimating process depends on people who are becoming harder to find. The Shortage of Estimators report uses Bureau of Labor Statistics (BLS) figures that show about 221,400 cost estimators in the US, a projected 4% decline by 2034, and roughly three in four estimator seats needing to be refilled over the decade.

A process built on hand counting cannot hold when each estimator carries more bids. The takeoff step has to move to software so that estimators can spend their hours on pricing and review.

estimator-reviewing-construction-plans

FAQs

What are the Steps in the Construction Estimating Process?

The steps are bid package review, the bid decision, material takeoff, labor takeoff, pricing, adding indirects with overhead and profit, and final review. The takeoff takes the most time.

What is the Most Time-Consuming Part of Estimating?

The takeoff is the longest step, because every item has to be counted and every run measured from the drawings. It can take a week or longer on a large package.

What Does a Construction Estimate Include?

It includes material, labor, equipment and subcontractor costs, plus job indirects, overhead and profit. It also lists the documents it is based on and any exclusions.

How Does The Takeoff AI Fit Into the Estimating Process?

The Takeoff AI estimates from the drawings and returns the material takeoff, labor takeoff and priced BOM in hours. Every number is highlighted on the drawing so the estimator can check it.

How Much Time Does AI Save in the Estimating Process?

Estimators using The Takeoff AI finish projects in 2 to 3 hours that used to take 30 to 40 hours. That is 90 to 95% of estimating time saved.

estimator-planning-construction-project

Conclusion

The slowest step in the construction estimating process is still done by hand, by fewer estimators each year. The Takeoff AI is the best option for contractors who need the takeoff done and priced in hours. For related reading, see the Handbook entry on the bid package, or request a demo of The Takeoff AI.