Bid Reference

How to Bid Commercial Plumbing Work

November 2026By Vini P.K.

Short Answer

To bid commercial plumbing, you read the plumbing drawings and the Division 22 specification, take off fixtures, piping, fittings, valves and equipment by system and size, then price the material from supplier quotes and the labor from labor units. Add subcontractor quotes, indirect costs, overhead and profit, and send the number with a scope letter that says what is in and what is out.

Specification section
Division 22 (Plumbing) in MasterFormat
Systems to split
Domestic water, sanitary waste and vent, storm drainage, natural gas
Labor priced by
Labor units per foot of pipe, per fitting and per fixture
Bid goes in as
Usually a lump sum, with a scope letter of inclusions and exclusions
Bid Reference · Plumbing

Commercial Plumbing Bid Checklist

The order a commercial plumbing bid gets built in, and what gets missed at each step.

StepWhat You DoWhat Gets Missed
1. Read the bid documentsInstructions to bidders, bid form, drawings, Division 22, every addendumAlternates and unit prices on the bid form
2. Take off fixtures and equipmentFixture schedule, water heaters, pumps, backflow preventers, drainsFixture carriers, trim and roof drains
3. Take off piping by systemPipe by size and material in linear feet, fittings by sizeBelow-slab piping and cleanouts
4. Take off valves, hangers and insulationEvery valve by size and type, hangers by spacing, insulation by systemHangers and pipe insulation
5. Price materialSupplier quotes for pipe, fittings, fixtures and equipmentQuote expiry dates and escalation
6. Price laborLabor units times your crew rate, adjusted for the jobHigh-rise, occupied or tight-access work
7. Add subcontractors and indirect costsInsulation, core drilling, testing, permits, equipment rental, supervisionPermits, testing and cleanup
8. Add overhead, profit and bondsYour overhead, your margin, a bid bond if the owner asks for oneThe bond cost on public work
9. Write the scope letterInclusions, exclusions, clarificationsAnything the drawings show but you didn't price

Keep the takeoff marked on the drawings, so you can answer the general contractor's questions on bid day.

How Do You Bid a Plumbing Job?

Work the bid in the order of the checklist above. The takeoff comes first because everything else hangs on it, and you can't price labor on pipe you haven't counted.

Take off by system and by size, never as one lump of pipe. Domestic water, sanitary waste and vent, storm and gas use different materials and different labor, and the general contractor will compare your number line by line against the other plumbing bids.

How to Bid Plumbing on New Construction

New construction plumbing runs in phases, and pricing it by phase keeps the bid clear and the billing simple later:

  • Underground: below-slab waste, storm and water lines, plus excavation and backfill if you carry them
  • Rough-in: piping in the walls and ceilings before they are closed
  • Top-out: vents through the roof and the tie-ins above the rough-in
  • Trim or finish: fixtures, trim, water heaters and startup

Most of the labor sits in underground and rough-in, where the pipe and fittings are. Fixtures cost more as material, but they go in fast.

Pricing the Labor

Labor is priced separately from material. Most estimators price it with labor units, the hours to install one fitting, one foot of pipe or one fixture, taken from published manuals such as the MCAA (Mechanical Contractors Association of America) labor estimating manual or from their own job cost history.

Adjust the units for the job in front of you. Work above a certain height, work in an occupied building, overtime and long material hauls all slow a crew down, and your own completed jobs are the best check on whether your units are right.

The Scope Letter

The scope letter states exactly what your price covers. List what you include by system, what you exclude, and any clarification about the drawings.

Common exclusions on commercial plumbing are excavation and backfill, concrete cutting and patching, fire protection, equipment furnished by others, and utility company fees. If the drawings show it and you didn't price it, say so in writing.

Common Mistakes on a Commercial Plumbing Bid

The one that costs the most is pricing from the floor plans without reading Division 22, because the specification decides the pipe material, the joint type, the insulation and the testing, and each of those moves the price.

The other regulars are missing an addendum, leaving out below-slab piping, counting pipe but not fittings, forgetting hangers and supports, and using labor units from a job nothing like this one.

Before you ask

Frequently Asked Questions

Short answers on building and sending a commercial plumbing bid.

Take off fixtures, piping and valves by system and size, price material and labor, add subcontractors, overhead and profit, and send a scope letter.