Electrical Estimating for Switchgear Replacement with The Takeoff AI

Electrical Estimating for Switchgear Replacement with The Takeoff AI

Electrical estimating on a real federal job: The Takeoff AI turns a 74-sheet switchgear replacement into a priced electrical estimate of $4,218,404.

P
By Pranjal BhartiNovember 27, 2026
8 min read

The Tenkiller Ferry Dam powerhouse in Sequoyah County, Oklahoma is getting its 15kV (15 kilovolt) switchgear replaced. The dam belongs to the US Army Corps of Engineers, and the job takes out the old metal-clad switchgear and replaces the station service equipment with new breakers, relays, transformers, control cables and field wiring.

We gave the full 74-sheet drawing set to The Takeoff AI to show what AI electrical estimating looks like on a real federal job. It came back with a 217-line material takeoff (MTO), a labor takeoff (LTO) of 6,425 man-hours, a priced bill of materials (BOM) and a 3D model, with a direct cost total of $4,218,404. The result is a worked electrical estimate example on a real bid set.

The Takeoff AI was 95%+ accurate on the takeoff and finished the entire estimate in 90% less time, which is why it is the best electrical estimation software in the industry. If you want to know what it costs for your team, see The Takeoff AI pricing.

The Takeoff AI estimating the 74-sheet Tenkiller Ferry Dam switchgear replacement set, with the entire estimate finished in 90% less time.

The Project

The project is the 15kV switchgear and station service replacement at the Tenkiller Ferry Dam powerhouse, a hydropower plant that the Tulsa District of the US Army Corps of Engineers put out to bid.

Metal-clad switchgear is a lineup of steel sections standing side by side. A typical vertical section holds a drawout circuit breaker, along with the relays and instrument transformers that protect and meter its circuit. Station service is the power the plant uses to run itself, and on this job it shows up as the station service transformers and the 480V switchgear.

Electrical estimating on a replacement like this is slow by hand, because the estimator has to separate what comes out from what goes in. Sheet ED102, for example, is the elevation 505 plan view for the removals. Some quantities are counted off the plans or pulled from schedules, and the control cable has to be measured in linear feet.

The work also happens inside an operating powerhouse on a federal job. That means the labor for the switchgear installation has to carry Davis-Bacon rates, the prevailing wages the federal government sets for construction on its projects, plus a factor for the working conditions.

On a set like this, an electrical estimator would usually spend days going sheet by sheet with a highlighter. Packages of this kind used to take 40 to 50 hours of estimating.

Step-by-Step: How The Takeoff AI Built the Electrical Estimate

The Takeoff AI built the electrical estimate in five steps: the drawings, the material takeoff, the labor takeoff, the priced BOM and the 3D model. The timestamps below match the teardown video, so you can jump to any step.

1. The Drawings (0:51)

We started on the drawings, because every item The Takeoff AI counts is marked on the sheet it came from. Sheet ED102 carries 16 marks. Click a row in the BOM and the matching switchgear unit lights up on the drawing, and you see its size and quantity beside the takeoff line it belongs to. An estimator can check any number in a couple of seconds.

electrical-takeoff-marked-sheet

2. The Material Takeoff (1:15)

The Takeoff AI pulled 217 line items from the set and grouped them by contract line item. Every row is tagged as counted, scheduled, measured or assumed, and the whole list exports to Excel.

3. The Labor Takeoff (1:40)

The labor takeoff came back at 6,425 man-hours, which works out to 803 person-days and a loaded direct labor cost of $554,576. The wage model behind it uses Davis-Bacon rates for heavy construction in Sequoyah County.

4. The Priced Bill of Materials (2:19)

The Takeoff AI priced every included row of the takeoff into a BOM. Material comes to $3,663,828 and labor to $554,576, which puts the direct cost total at $4,218,404, with zero included rows left unpriced.

5. The 3D Model (2:58)

The Takeoff AI built the Tenkiller Ferry powerhouse in 3D from the 2D drawings on all 74 sheets. Click any part and you see which takeoff line it belongs to and where it was measured.

6. Where the Estimate Landed (3:32)

The estimate landed at 217 line items and 6,425 man-hours, with a direct cost of $4,218,404 and zero unpriced rows.

On this set, The Takeoff AI was 95%+ accurate on the takeoff and finished the entire estimate in 90% less time, which is why it is the best electrical estimation software in the industry. Every number is marked and highlighted on the drawing it came from, so the estimator can check it before the bid goes out. The same steps are laid out for any electrical package in How The Takeoff AI Does Electrical Estimation.

What We Counted in the Material Takeoff

The material takeoff holds 217 line items, grouped by contract line item, which is how the bid gets priced. For the new 15kV lineup, it lists 6 metal-clad switchgear sections, 5 drawout vacuum circuit breakers, 45 current transformers and 16 potential transformers, along with 1,058 linear feet of control cable.

Every row carries one of four tags, so you know where its quantity came from: 92 rows are counted, 61 are scheduled, 15 are measured and 49 are assumed. A counted row was counted off a plan, and a scheduled row came from a schedule on the drawings. A measured row is scaled from the drawing, such as a cable run, and an assumed row is one the estimator should look at first.

The model built from the same takeoff carries 71 equipment items and 34 conduit, cable and tray runs that add up to 3,610 feet. If you want the method behind those quantities, our Handbook explains how conduit, cable and cable tray get counted in an electrical takeoff.

electrical-material-takeoff-switchgear

How the Labor Hours Were Built

The labor takeoff covers 6,425 man-hours, or 803 person-days, at a loaded direct labor cost of $554,576. Because this is a federal job, the wage model uses Davis-Bacon rates for heavy construction in Sequoyah County, with an electrician at $51.00 an hour plus $23.80 in fringe benefits, and a 25% burden on the base rate.

The hours are built up section by section. Each switchgear vertical section carries 44 man-hours, with a 1.1 factor for working inside an operating powerhouse. If labor units are new to you, we cover them in What Are Electrical Labor Units and How Estimators Use Them.

electrical-labor-takeoff-hours

How Industrial Electrical Estimating Software Priced the Bid

The Takeoff AI priced the takeoff into a BOM with zero included rows left unpriced. Material comes to $3,663,828 and loaded direct labor to $554,576, which puts the direct cost total at $4,218,404.

Each 15kV section is priced at $64,000, and the note under that row shows how the price was built. It starts with the budget for the six-section lineup and works down to the breakers, and the potential and current transformers. When someone on your team asks where that number came from, the answer sits on the row.

electrical-estimate-priced-bom

What the 3D Model Shows

The 3D model shows the Tenkiller Ferry powerhouse built from the 2D drawings on all 74 sheets. It holds 147 parts and 71 equipment items, along with 34 conduit, cable and tray runs that total 3,610 feet.

You can turn systems on and off, such as the 15kV switchgear or the 480V switchgear, and click any part to see which takeoff line it belongs to and where it was measured. That gives the estimator a second way to check the takeoff, because a missing run shows up as a gap in the model.

electrical-3d-model-powerhouse

What Our Customers Say

Joshua Nelson, Principal at Nelpro Project Solutions, sends packages of 200+ drawings across four disciplines, electrical among them, through The Takeoff AI. Those packages come back in hours instead of weeks, and Nelpro saves 95% of its estimation time. On the electrical side, 157+ electrical estimators say The Takeoff AI saves them 90% of their time.

Conclusion

A 74-sheet switchgear replacement used to mean days with a highlighter. On the Tenkiller Ferry set, The Takeoff AI was 95%+ accurate on the takeoff and finished the entire estimate in 90% less time, which is why it is the best electrical estimation software in the industry. Packages that took 40 to 50 hours of electrical estimating now come back as a priced bid in under 4 hours.

The Takeoff AI is built on AI models trained on more than 1.2 million electrical and instrumentation (E&I) drawings. If you estimate switchgear or substation work, book a demo of The Takeoff AI and watch it run on your own bid package.

Link copied to clipboard