A takeoff done by hand takes 25.5 hours on a typical industrial bid worth $1M to $5M. That is 17.3 hours of counting what the drawings show and 8.2 hours of checking the count.

See the Hours by Trade
Source
The Bid Room community poll
Sample
661 estimators
Bid Size
One bid worth $1M to $5M
Poll Completed
28 November 2026
See the Hours by Trade

Takeoff hours by trade

FIGURE 01

Piping and mechanical

28.2 Hrs

Structural steel and miscellaneous iron

24.2 Hrs

Electrical and instrumentation

23.6 Hrs

HVAC and plumbing

23.0 Hrs

0102030 Hrs
Hours for one bid worth $1M to $5M, done by hand. Each figure is the middle answer from 661 estimators.
25.5 Hrs
Takeoff done by hand on a typical industrial bid worth $1M to $5M
8.2 Hrs
Of that goes to checking, after 17.3 hours of counting
39%
Of the 66.1 hours a whole bid takes go to the takeoff
661
Estimators polled through The Bid Room community

What Counts as a Takeoff in This Report

A takeoff is the list of everything the drawings say has to be bought and installed. The estimator goes through each sheet and counts the pipe, fittings, valves, steel, cable and duct, then checks that count against the other documents in the bid package.

Takeoff hours on one bid, all trades

25.5 Hrs

39% of a 66.1 hour bid

Counting
17.3 Hrs
Checking
8.2 Hrs

This report treats two stages as the takeoff:

  1. 01Counting, which the trade calls the material takeoff.
  2. 02Checking, which means going back through the drawings and counting again wherever two documents disagree.

Four other stages are measured separately: reading the job, redoing work after the owner changes the drawings, retyping quantities into a pricing sheet, and pricing. Every figure is for one bid worth $1M to $5M, done the way the estimators polled work today.

See What a Quantity Takeoff Covers →

Takeoff Hours by Trade

A piping and mechanical takeoff runs at least 4 hours longer than any other trade. The other three trades sit within 1.2 hours of each other.

The full report has the table for all four trades, with the hours to count, the hours to check, the whole bid and the takeoff’s share of it.

Piping and Mechanical Takeoff Takes 28.2 Hours

A piping takeoff takes 18.8 hours to count and 9.4 hours to check, the longest of the four trades on both stages.

Takeoff hours on one bid

28.2 Hrs

38% of a 73.9 hour bid

Counting
18.8 Hrs
Checking
9.4 Hrs

Piping takes longer because one pipe is described in three documents. The P&ID (piping and instrumentation diagram) shows the valves and instruments, the isometric drawings show each line with its fittings and welds, and the line list gives the size and material. The estimator lines all three up before counting a single foot of pipe, and compares them again wherever the numbers disagree.

The hours grow with the size of the package. An estimating manager at a refinery piping contractor put it this way: ‘So, 200 ISOs could take up to 5 days.’ ISOs are isometric drawings.

A mechanical takeoff sits in the same group, because mechanical estimating often carries piping, equipment and supports in one bid.

Joseph Gentry, Chief Executive Officer, GM&I Services

By hand at GM&I Services

A takeoff took 3 to 4 days on a 20 to 30 page public bid, and the final numbers took about 2.5 days.

As reported by

Joseph Gentry

Chief Executive Officer, GM&I Services

Poll of 661 estimators
28.2 Hrs
GM&I Services, by hand
3 to 4 Days

Joseph Gentry, Chief Executive Officer of GM&I Services, is the company’s only estimator, and he scaled the drawings by hand between site visits and calls. GM&I Services installs, repairs and maintains wastewater lift stations from Alvin, Texas, and its estimates cover mechanical, electrical, plumbing and structural work. About half of a 10-hour workday went to quoting and estimating.

Joseph Gentry, GM&I Services, estimates a 26-page bid set in about 2 hours with The Takeoff AI.

Structural Steel and Miscellaneous Iron Takeoff Takes 24.2 Hours

A steel takeoff takes 17.25 hours to count and 6.95 hours to check. The count is the second longest of the four trades, and the check is the shortest.

Takeoff hours on one bid

24.2 Hrs

39% of a 61.3 hour bid

Counting
17.25 Hrs
Checking
6.95 Hrs

The count is long because every beam, column, plate and connection is its own line on the takeoff. Miscellaneous iron adds stairs, railings, ladders and embed plates, and those are often spread across drawings that belong to other trades.

That makes finding the scope part of the job. The estimator has to go through the whole package to be sure no stair or railing was left on a sheet nobody opened.

Peter Sirois, President and Owner, American Steel Fabricators

By hand at American Steel Fabricators

A takeoff took 20 to 30 hours on a $2 million structural job with $500,000 of miscellaneous iron.

As reported by

Peter Sirois

President and Owner, American Steel Fabricators

Poll of 661 estimators
24.2 Hrs
American Steel Fabricators, by hand
20 to 30 Hrs

Peter Sirois, President and Owner of American Steel Fabricators, and his estimators worked through each drawing set by hand with a scale and a highlighter. The New Hampshire fabricator receives 1,500 to 2,000 bid invitations a year, and the team had time to price 300 to 400 of them.

Peter Sirois, American Steel Fabricators, estimates steel projects in about 1 hour with The Takeoff AI.

Electrical and Instrumentation Takeoff Takes 23.6 Hours

An electrical takeoff takes 15.6 hours to count and 8.0 hours to check.

Takeoff hours on one bid

23.6 Hrs

38% of a 62.4 hour bid

Counting
15.6 Hrs
Checking
8.0 Hrs

Electrical estimating runs on long schedules. The estimator works through cable schedules, conduit runs, cable tray and instrument lists, and many of the lengths are not written down, so they have to be measured off the plans.

The check is the second longest of the four trades. A cable schedule can name a route without saying how much of the cable sits in tray and how much needs conduit, and the estimator goes back to the drawings to work it out.

Sorting the package comes before any of that. A veteran electrical and instrumentation estimator described what arrives: ‘a lot of times you get a file dump and it may say electrical and it’s 500 drawings.’

Joshua Nelson, Principal, Nelpro Project Solutions

By hand at Nelpro Project Solutions

‘Before The Takeoff AI, it would take several weeks to procure an estimate.’

Joshua Nelson

Principal, Nelpro Project Solutions

Poll of 661 estimators
23.6 Hrs
Nelpro Project Solutions, by hand
Weeks

A takeoff took weeks, with several estimators working on one package. Joshua Nelson, Principal of Nelpro Project Solutions, leads a team that estimates power generation and chemical plant projects. A package there can run past 200 drawings across electrical, mechanical, piping and structural, and one large takeoff could cost more than $100,000 in estimator time.

Joshua Nelson, Nelpro Project Solutions, estimates a full drawing set in under 2 hours with The Takeoff AI.

HVAC and Plumbing Takeoff Takes 23.0 Hours

An HVAC or plumbing takeoff takes 15.5 hours to count and 7.5 hours to check, the shortest takeoff of the four trades.

Takeoff hours on one bid

23.0 Hrs

39% of a 59.7 hour bid

Counting
15.5 Hrs
Checking
7.5 Hrs

Most of the hours go on repetition. A ductwork takeoff or a plumbing takeoff counts the same fittings, hangers and lengths again and again across dozens of sheets.

Part of the time goes on finding the right sheets. An estimator at a ductwork contractor described the search: ‘it’s like a wild goose chase trying to find all the drawings that have ductwork on them.’

Poll of 661 estimators

23.0 Hrs

An HVAC or plumbing takeoff by hand, counting plus checking, on one bid worth $1M to $5M.

By hand at Nelpro Project Solutions

Weeks

Nelpro Project Solutions estimates the mechanical packages on power generation and chemical plant projects, and a full set took weeks by hand.

Joshua Nelson

Principal, Nelpro Project Solutions

By hand at GM&I Services

3 to 4 Days

GM&I Services estimates the plumbing on its lift station bids, and a 26-page set took 3 to 4 days by hand.

Joseph Gentry

Chief Executive Officer, GM&I Services

Nelpro Project Solutions and GM&I Services estimate mechanical and plumbing work in about 2 hours with The Takeoff AI.

Price your bid before your competitors open the package.